Sunday, March 7, 2010

New Crew

A long but good day, lots of things got done. I painted the yellow under the half round and got interrupted a few times because Dan wanted me to help Jesse bend on the royal sail. We ended up not getting to do it because things weren’t dry, NP1 around the yolk and the yardarms.

The mast got more finished, copper and sheaves all put in, I got to slush the mast, linseed oil and tallow, gross fun. Ryan finished up installing his cable from the mizzen down to the main mast that holds the mast up. The rig was tightened some more and Katie pained some more of the red cap rail.

Got two new crewmembers that are going to be AB’s, John and Michelle.

2 comments: